LOCATION | Hindalco Industries Limited, FRP Plant, Project Bluefox |
APPLICATION DETAILS | Line length: 800 Meters (2 Lines), Bolt Sizes : M8 – M30 (Mix of Bolts) |
PRESENT SOLUTION | Customer is loosening and tightening the Bolts manually |
CHALLENGES | Downtime is extremely expensive to the Customer. Maintenance needs to be swift to ensure immediate resumption on line after breakdown. |
SOLUTION | We have suggested the Customer use of array of Tools including. We have made Demonstration of the Tool to the Customer. To help workers develop comfort with pneumatic Impact Wrench we are providing workshops. |
BUSINESS 2018 | 3.6 Lakhs |
BUSINESS EXPECTED 2019 | 1.8 Lakhs |